Regulation · 05 · Agenda

Reforms needed: an agenda for energy communities in Ukraine

Ukraine needs energy communities for the same reasons as the EU, plus one more: resilience to attacks on the power system. The law exists. Three groups of decisions are now needed: procedure, data and a fair tariff. Below is our agenda with priorities.

Proposal sent to the regulator
Checked against sources
21 Nov 2026
Reading time
3 min

Why reform

  • Resilience. Distributed generation next to consumers, organised around one network section, recovers faster and can supply critical sites in island mode.
  • Community investment. A community lets residents, municipalities and small businesses jointly fund a plant none could afford alone.
  • Less network load. Energy consumed nearby does not load higher network levels.
  • European integration. Directives 2019/944 and 2018/2001 require Energy Community Contracting Parties to provide an enabling framework for communities.

More in Why Ukraine needs energy communities.

The agenda

  1. 1. Launch the procedure

    Adopt the community resolution with clarifications on algorithm versions, roles, data and member exit (GEO-01 – 09, GEO-SUP-01 – 05). In parallel amend the Metering Code: virtual metering point and data access.

    Coming months · NEURC

  2. 2. Open data and define roles

    A standard DataHub interface for authorised parties with consumer consent, a test environment, public access indicators. A community administrator role in the retail rules.

    2027 · NEURC, administrator

  3. 3. A fair tariff

    A proximity confirmation procedure in the Distribution Code, a tariff proceeding with cost analysis by voltage level, a pilot on several substations, annual review.

    2027–2028 · NEURC, DSOs

Who needs to do what

Reforms by responsible body
ReformResponsibleActPriority
Adopt retail rules chapter 10.3 with clarificationsNEURCCommunity resolutionHigh
Virtual metering point and data exchange procedureNEURC, administratorMetering Code, administrator rulesHigh
Third-party data access with consentNEURC, administratorMetering Code (Art. 53(6))High
Community administrator roleNEURCRetail rulesHigh
Confirmation of electrical proximityNEURC, DSOsDistribution CodeMedium
Tariff methodology for local sharingNEURCSeparate methodologyMedium
“Fair payment” for DSO cooperationNEURCArt. 58-2(3)Medium
Tax guidance for communitiesMinistry of Finance, tax serviceGuidance, Tax Code changes if neededMedium
Local network resilience zonesParliament, NEURCLaw, Distribution and Metering Codes (package No. 37)Long-term

Principles we follow

  • Justification, not subsidy

    A network reduction only where analysis proves lower costs.

  • Measurability

    Every right rests on certified data and can be checked.

  • Freedom of choice

    Members can leave; a community can change administrator or aggregator without losing data.

  • Proportionality

    Requirements for a small community should not equal those for a supplier.

How to get involved

  • Communities and condominiums: start with the legal entity, member register and meter check (launch conditions).
  • Municipalities: identify daytime loads (schools, water utilities) – they strengthen a community’s economics.
  • Experts and DSOs: send comments on these pages – we update them after every regulatory change.
  • Everyone: take part in public consultations on NEURC drafts.

Sources

  1. Law No. 2019-VIII, Arts. 53, 58-1, 58-2 (in Ukrainian) (opens in a new tab) · Verkhovna Rada of Ukraine
  2. NEURC draft resolution of 4 Nov 2026 (in Ukrainian) (opens in a new tab) · NEURC

    A draft, not adopted.

  3. Wesfin Flex submissions Nos. 59, 66; package No. 37 (Ukrainian) · Wesfin Flex LLC

    Proposals, not adopted.

  4. Directive (EU) 2019/944 (opens in a new tab) · EUR-Lex
  5. Directive (EU) 2018/2001 (opens in a new tab) · EUR-Lex

This is an explanatory text by Wesfin, not legal advice. Legal acts are quoted from official texts as of the check date; verify the current version before acting.