Regulation · updated 21 Nov 2026

Community energy regulation: what is in force, what is draft, what we propose

We separate four things that are often confused: rules already in force; the regulator’s draft, which may still change; the proposals Wesfin Flex sent to NEURC; and questions nobody regulates yet. Every statement links to its primary source.

Articles
5
Languages
Ukrainian, English
  1. 01In force

    Ukrainian law on community energy: what is already in force

    Rules in force: the definition, the nine parts of Article 58-2 of Law 2019-VIII, active consumer rights, data access (Art. 53), Laws 4834-IX and 4963-IX, and secondary legislation.

  2. 02Draft, not adopted

    NEURC draft resolution of 4 Nov 2026: the community energy-sharing procedure

    What the draft amendments to retail rules No. 312 and procedure No. 2651 propose: chapter 10.3 on communities, a virtual metering point in DataHub, static and dynamic algorithms, imbalances, member exit, a 10 kWh threshold. A draft, not adopted.

  3. 03Proposal sent to the regulator

    Wesfin Flex proposals to NEURC: Nos. 37, 59 and 66

    All 19 Wesfin Flex comments on the NEURC community draft (Nos. 59 and 66) and package No. 37 on local network resilience zones: what is proposed, to which point and why. Proposals, not rules in force.

  4. 04Not regulated

    Open questions: what is still unresolved for launching communities

    Thirteen questions neither the law nor the NEURC draft answers: the virtual metering point, data access, proximity tariffs, the administrator, imbalances, taxation. Who should settle them and what Wesfin proposes.

  5. 05Proposal sent to the regulator

    Reforms needed: an agenda for energy communities in Ukraine

    What must change, and in what order, for communities to work: adopt the NEURC procedure, open DataHub data, introduce proximity tariffs, define roles. Wesfin proposals with references.

Four statuses of community energy rules as of 21 Nov 2026
  1. Law in forceArt. 58-2 of Law 2019-VIII: communities recognised, member rights set
  2. NEURC draft4 Nov 2026: community procedure in the retail rules, virtual metering point, algorithms. Not adopted
  3. Wesfin Flex proposalsNos. 37, 59, 66 sent to the regulator. No decisions
  4. Not regulated yetproximity tariff, DSO confirmation, data access, taxes
Legal map of community energy
QuestionLaw in forceNEURC draft of 4 Nov 2026Wesfin Flex proposalNot regulated yet
Status and membersYes: Arts. 1 and 58-2, Law No. 2019-VIIIDetails rights (p. 10.3.1)Separate accounting allocation from licensed distribution (GEO-SUP-05)Model charters and agreements
Sharing among membersMembers may consume energy from the community’s plants (Art. 58-2 part 8)Static and dynamic algorithms, 15 or 60 min (p. 10.3.10)One time resolution, surplus rule (GEO-04, GEO-SUP-03)Procedure in the Commercial Metering Code
Virtual metering pointNoYes, in DataHub (p. 10.3.7)Creation and testing procedure in the Code (GEO-02)Technical implementation by the administrator
Network chargesCost-reflective tariffs (Art. 58-2 part 4; Art. 58-1 part 1)Members pay for volumes transported (pp. 10.3.2, 10.3.16)Do not block a differentiated tariff (GEO-TAR-01, GEO-TAR-02)A proximity tariff methodology
Data accessNon-discriminatory access via the administrator (Art. 53 part 6)Exchange under the Metering Code (p. 10.3.14)Data for the community and its agent (GEO-SUP-04)Interface, deadlines, format
ImbalancesCommunity is a BRP or transfers responsibility (Art. 58-2 part 7)Same (p. 10.3.18)No automatic BRP duties for an aggregator (GEO-07)–
Draft point numbers follow the text of pr_320-2026.docx as quoted in the Wesfin Flex submissions. The draft may change before adoption.