Learn · 02
How energy sharing works in a community: metering, algorithms, roles
Sharing in a community does not need private wires between members. Power flows through the ordinary grid, and the community uses an agreed rule to decide which part of the energy generated in each 15-minute interval belongs to each member. Everything else – residual supply, the grid, imbalances – follows the general market rules.
Two layers: physical and accounting
Electrons cannot be “addressed” to a particular flat. When shared PV exports to the grid, the energy is physically consumed by the nearest loads. Sharing is an accounting procedure: meter data determine how much generated energy in an interval is attributed to each member, and those volumes are not bought from the supplier.
Physical layer: power flows through the grid
Accounting layer: shares are allocated in data
Conceptual diagram. Official data are produced by the metering service provider and the metering administrator; Wesfin GEO does not replace them.
An important consequence: the closer the plant and the consumers are in the grid, the fewer networks are actually used. If all members sit on one 0.4 kV substation, local energy does not pass through 10 kV and higher transformers. This is the basis of the proposals for a tariff by electrical proximity.
Why 15 minutes
Solar output and demand change within the hour. Compared over a day or a month, the plant would appear to “cover” consumption that did not happen while it was generating – evening lighting with midday sun, for instance. This is why both the EU and the NEURC draft tie allocation to short settlement intervals.
- Austria: allocation in every form of community energy is based on 15-minute smart-meter values.
- Ukraine, NEURC draft (Retail Rules p. 10.3.10): the dynamic algorithm allocates energy in each 15-minute or 60-minute interval.
- Wesfin Flex proposal (GEO-04): use data of a single resolution within one settlement period, and convert between 15 and 60 minutes only under a Commercial Metering Code procedure that preserves the energy balance.
Allocation algorithms
The NEURC draft (p. 10.3.10) provides two algorithms, approved in the community’s charter. Mixed rules are also used in the EU.
| Algorithm | How it works | Strengths | Risks |
|---|---|---|---|
| Static | Each member has a fixed share of generation (e.g. in proportion to investment), regardless of current demand | Simple, predictable, mirrors investment shares | A share may exceed the member’s demand; a surplus rule is needed (draft p. 10.3.12) |
| Dynamic | Energy in each interval is split in proportion to members’ actual demand in that interval | The most energy is used inside the community | Larger consumers receive more; balancing payments between members may be needed |
| Mixed (not in the draft) | A guaranteed static share first, the remainder dynamically | Combines fairness to investors with full use | Harder to audit; not expressly provided for in the NEURC draft |
Static: 50 / 25 / 25 %
The block is assigned 3 kWh but used only 2. The remaining 1 kWh must be reallocated by rule or become surplus.
Dynamic: in proportion to use
12 kWh × (member use ÷ 16 kWh). Nothing is left unused.
Educational simulation, not metering-administrator data and not a bill. Volumes rounded.
Static 50/25/25%: the school gets 6 kWh, the block 3, the workshop 3. But the block used only 2 kWh, so 1 kWh cannot be attributed to it. The draft says the unused remainder is “automatically reallocated to other members or counted as community surplus”. In comment GEO-SUP-03, Wesfin Flex proposed fixing the order in advance in the algorithm and prohibiting attribution above confirmed demand.
Dynamic: 12 × 8/16 = 6 kWh for the school, 12 × 2/16 = 1.5 for the block, 12 × 6/16 = 4.5 for the workshop. All generation is used inside the community and residual demand from the grid is 4 kWh.
| Member | Used, kWh | Static: from community | Static: from supplier | Dynamic: from community | Dynamic: from supplier |
|---|---|---|---|---|---|
| School | 8 | 6 | 2 | 6 | 2 |
| Block | 2 | 2 | 0 | 1.5 | 0.5 |
| Workshop | 6 | 3 | 3 | 4.5 | 1.5 |
| Total | 16 | 11 | 5 | 12 | 4 |
Surplus and storage
When generation exceeds the demand of all members, the surplus is exported. It can be sold to a supplier, through an aggregator or on the market, under contracts held by the community. The law allows a community to take part in all market segments directly or through an aggregator (Art. 58-2 part 5) and makes it responsible for imbalances (part 7).
Storage moves daytime energy into the evening and raises the shared portion. Every kilowatt-hour must still be counted once: what was charged from the grid, what from the PV, and how much was lost in storage. The NEURC draft separately changes how transmission and distribution charges apply to storage operators; in GEO-SUP-07 Wesfin Flex asked not to extend those special rules automatically to all community sharing.
How a member’s bill changes
A member still receives a bill from their supplier, but only for residual consumption. For the community share they pay the community at the internal price. Under the NEURC draft (p. 10.3.13), the supplier bills on the basis of the metering administrator’s certified data with the algorithm applied.
| Component | Charged by | Depends on |
|---|---|---|
| Community energy share | The community, under the participation agreement | Internal price approved by members; tax treatment |
| Residual supply | The member’s supplier | Supply contract; certified volumes minus the community share |
| Transmission and distribution | TSO / DSO (via the supplier or directly) | Under the draft, volumes transported taking internal allocation into account (p. 10.3.16); NEURC tariffs |
| Administration, maintenance | The community or its agent | Community budget, contractor agreements |
Who does what
Several parties take part in one process, but each keeps its own status. This protects members and preserves their right to choose a supplier and a service provider.
| Party | Task | Boundary |
|---|---|---|
| Community (legal entity) | Charter, membership, algorithm, member agreements, selling surplus, imbalance responsibility | Forming a community does not by itself grant a supply or DSO licence |
| Members | Consent, confirming their metering points, choosing a supplier, paying for their share | Keep all consumer rights (Art. 58-2 part 2) |
| Administrator (e.g. Wesfin GEO) | Register, algorithm versions, calculations and reports on the community’s instructions | Does not replace the metering provider, administrator, supplier or DSO |
| Metering service provider | Reading and validating data; under the draft, calculating shares (p. 10.3.11) | – |
| Metering administrator (DataHub) | Official certified data; under the draft, the virtual metering point (p. 10.3.7) | The single data source for settlement |
| DSO / TSO | Operating networks, connections, network services | Sharing a network does not automatically cancel network charges |
| Supplier and BRP | Residual supply, imbalance responsibility | Internal allocation is not a supply contract |
Sources
- Law No. 2019-VIII, Art. 58-2 (in Ukrainian) (opens in a new tab) · Verkhovna Rada of Ukraine
- NEURC draft resolution “On approval of amendments to certain NEURC resolutions”, published 4 Nov 2026 (in Ukrainian) (opens in a new tab) · NEURC
Chapter 10.3 point numbers follow the draft text as quoted in Wesfin Flex submissions Nos. 59 and 66.
- Wesfin Flex submission No. 59 of 10 Nov 2026 (PDF, Ukrainian) · Wesfin Flex LLC
- Wesfin Flex submission No. 66 of 17 Nov 2026 (PDF, Ukrainian) · Wesfin Flex LLC
- Messung und Aufteilung (opens in a new tab) · Austrian Coordination Office for Energy Communities
15-minute values; dynamic allocation by default.
This is an explanatory text by Wesfin, not legal advice. Legal acts are quoted from official texts as of the check date; verify the current version before acting.
Read next
- Learn
Community economics: scenarios for apartment blocks, municipalities, households and small business
Illustrative numbers for an apartment block, a municipality, a village and small businesses: how much energy is shared, what drives the benefit and why the network tariff decides.
- Learn
Commercial launch of a community: seven conditions before sharing becomes billing
What a community needs to move from a model to real settlement: a legal entity, contracts, verified metering points and EICs, official metering, an algorithm, financial settlement and work with suppliers and BRPs.
- Regulation
NEURC draft resolution of 4 Nov 2026: the community energy-sharing procedure
What the draft amendments to retail rules No. 312 and procedure No. 2651 propose: chapter 10.3 on communities, a virtual metering point in DataHub, static and dynamic algorithms, imbalances, member exit, a 10 kWh threshold. A draft, not adopted.