The law already allows a community to be set up, but from a charter to the first bill that reflects shared energy there are seven steps. A community can take some of them now; others depend on NEURC decisions and DataHub readiness. Below is what each step requires, which rule it rests on and what can already be done.

Checked against sources
21 Nov 2026
Reading time
6 min

Seven launch conditions

The sequence of conditions: each rests on the previous one
  1. 01Community legal entity
  2. 02Member agreements
  3. 03Verified metering points / EIC
  4. 04Official metering and virtual point
  5. 05Allocation algorithm
  6. 06Supplier, BRP, invoices
  7. 07Pilot reconciliation

1. The community legal entity

A community energy organisation is a legal entity voluntarily formed by individuals, small and micro enterprises and/or local authorities, whose main purpose is not profit (Art. 1 of Law 2019-VIII). Under Art. 58-2 it may be set up as a public association, as a condominium association (OSBB) or in another non-profit form permitted by law.

Forms communities consider
FormSuitsWatch out for
Condominium association (OSBB)An apartment building with rooftop PVGeneral meeting decision; whether all co-owners become members; the building’s common loads
Public associationResidents of several buildings, villages, mixed communitiesThe charter must expressly cover energy activity, membership, exit and the algorithm
Another non-profit form (e.g. cooperative, association)A community with a municipality and businessesCheck that the form admits these members and has no profit-distribution purpose
The form affects taxation, which is not specifically regulated for communities. Legal and tax advice is needed.

The charter sets out: members and their rights, joining and leaving, approval and change of the allocation algorithm (draft p. 10.3.10), how the internal price is set and how surplus revenue is used.

2. Contracts

The minimum set of contracts
ContractPartiesCoversBasis
ParticipationThe community and each memberAlgorithm, price of shared energy, settlement, data consent, exitCivil law; draft p. 10.3.15
Supply (residual)Member and supplierEnergy beyond the community share. The member keeps the right to switchRetail rules; Art. 58-2 parts 2, 9
Sale of surplusCommunity and buyer (trader, supplier, market)Energy not allocated to membersArt. 58-2: participation in all market segments
Imbalance settlementCommunity and a BRP (unless the community becomes one)Financial responsibility for deviationsDraft p. 10.3.18
MeteringCommunity and metering service providerMetering of generation, algorithm parametersDraft pp. 10.3.9, 10.3.11
Administration (optional)Community and administratorRegister, data, calculations, reports on its behalf, without a licensed statusProposal GEO-SUP-01 (not adopted)

3. Verified metering points and EIC codes

Each member brings one or more metering points, each with an EIC code in DataHub. The community keeps a register of members with their EIC codes (draft p. 10.3.9). One wrong code means shared energy is credited to the wrong customer or counted twice.

  • The member confirms the metering point is theirs and consents to its inclusion.
  • The register records when each point joined and left, so settlement for past periods stays reproducible (proposal GEO-03).
  • A point’s EIC code does not replace the member’s identity: one person may have several points, and a point may change owner (GEO-SUP-02).

4. Official metering and the virtual metering point

Settlement can only use certified metering data: interval (15- or 60-minute) smart-meter data read and validated by the metering service provider and certified by the metering administrator in DataHub (draft pp. 10.3.13, 10.3.14). Data from one’s own sensors, inverters or apps is fine for modelling, not for bills.

The draft provides for a virtual community metering point in DataHub aggregating all members’ points (p. 10.3.7). How it is created, changed and tested is not yet defined. Wesfin Flex proposed setting this out in the Metering Code and the administrator’s rules, and meanwhile not treating unverified data as certified (GEO-02).

5. The allocation algorithm

The community’s charter approves the algorithm, and its parameters go to the metering service provider (draft pp. 10.3.9, 10.3.10). The draft offers static (fixed percentages) and dynamic (in proportion to consumption in the interval) algorithms. See How energy sharing works.

  • Each version has a number and an effective date; a change does not rewrite past periods.
  • A member’s share in an interval cannot exceed their actual consumption, and the sum of shares cannot exceed available generation (GEO-SUP-03).
  • Members get an explanation of how their share was calculated and can ask for reconciliation (GEO-05).

6. Financial settlement and market participants

After allocation a member has two volumes: energy from the community and residual energy from the supplier. Under the draft the supplier bills the residual on the basis of certified data (p. 10.3.13), and each member pays network services at the Regulator’s tariffs (p. 10.3.16). The member pays the community for its share at the internal price in the participation agreement.

Who pays whom (under the NEURC draft)
PaymentPayerPayeeBasis
Shared energyMemberCommunityParticipation agreement; share per algorithm
Residual energyMemberSupplierCertified data accounting for allocation
Distribution and transmissionMember (via supplier or directly)DSO, TSONEURC tariffs; volumes accounting for internal allocation
SurplusBuyerCommunitySale contract
ImbalancesCommunity or its BRPTSO / BRPMarket rules; draft p. 10.3.18
Tax treatment of community income, VAT on the internal price and accounting for business members are not specifically regulated for communities.

A community may participate in the market itself or through an aggregator (draft p. 10.3.3). Wesfin Flex proposed clarifying that the community chooses its aggregator and that market participation does not automatically confer BRP status or a licence (GEO-01). Leaving the community and switching supplier follow the general procedure (p. 10.3.20).

7. Pilot reconciliation

Before the first real bill, run a few months “in shadow”: calculate shares alongside current bills, reconcile the community’s, the metering provider’s and the supplier’s results and show members how their bill would have changed. This catches errors in EICs, time intervals and the algorithm before they become money.

What a community can do now

Readiness of conditions as of 21 Nov 2026
ConditionPossible nowWaiting for
Legal entityYes–
ContractsPrepare draftsFinal retail rules
Metering points and EICsCollect and check codes, member consentsConfirmation procedure in the Metering Code
Official meteringCheck meters and metering providerVirtual point and data exchange procedure
AlgorithmChoose and modelAdoption of p. 10.3.10
Settlement, BRPTalk to supplier and BRPAdoption of the resolution; tax guidance
Pilot reconciliationModelling on test dataAccess to certified data

Wesfin GEO helps with preparation: member and consent register, metering point checks, modelling of algorithms on test data. The platform does not run commercial settlement until the conditions above are met. See Wesfin GEO, Flex and EDDIE.

Sources

  1. Law No. 2019-VIII, Arts. 1, 58-2 (in Ukrainian) (opens in a new tab) · Verkhovna Rada of Ukraine

    In force: definition, forms, member rights.

  2. NEURC draft resolution of 4 Nov 2026 (in Ukrainian) (opens in a new tab) · NEURC

    A draft, not adopted. Chapter 10.3 points as quoted in submissions Nos. 59 and 66.

  3. Retail Electricity Market Rules (NEURC resolution No. 312, in Ukrainian) (opens in a new tab) · NEURC
  4. Commercial Metering Code (NEURC resolution No. 311, in Ukrainian) (opens in a new tab) · NEURC
  5. Wesfin Flex submission No. 59 of 10 Nov 2026 (PDF, Ukrainian) · Wesfin Flex LLC

    GEO-01 to GEO-09. Proposals, not adopted.

  6. Wesfin Flex submission No. 66 of 17 Nov 2026 (PDF, Ukrainian) · Wesfin Flex LLC

    GEO-SUP-01 to 08, GEO-TAR-01, 02. Proposals, not adopted.

This is an explanatory text by Wesfin, not legal advice. Legal acts are quoted from official texts as of the check date; verify the current version before acting.

Read next