Regulation · 04 · Gaps
Open questions: what is still unresolved for launching communities
The law recognised communities and the NEURC draft described the core procedure, but between them and the first real bill lie questions no act answers today. This list shows who should settle each one and whether a proposal exists.
List of gaps
| Question | Where it should be settled | State on 21 Nov 2026 | Wesfin proposal |
|---|---|---|---|
| How the virtual community metering point is created and changed | Metering Code, administrator rules | Only mentioned in the draft (p. 10.3.7) | GEO-02 |
| How a community and third parties obtain members’ data | Metering Code (Law Art. 53(6)) | The law requires it, no procedure yet | GEO-05, GEO-SUP-04 |
| “Fair payment” for DSO cooperation with communities | Regulator’s procedure (Art. 58-2(3)) | Not set | – |
| How a DSO confirms electrical proximity of metering points | Distribution Code | Not regulated | GEO-SUP-08 |
| A tariff for sharing over the DSO network | NEURC tariff methodology | The draft refers to general tariffs | GEO-TAR-01, GEO-TAR-02 |
| The role of an independent community administrator | Retail rules | Absent from the draft | GEO-SUP-01 |
| The line between allocation and licensed supply or distribution | Retail rules, licence conditions | The draft lists “distribution” among community activities | GEO-SUP-05 |
| Community, aggregator and BRP roles on imbalances | Market Rules, retail rules | The draft names two options only | GEO-01, GEO-07 |
| How communities take part in market segments | Regulator’s procedure (Art. 58-2(5)) | Not set separately | GEO-01 |
| Specifics for condominium associations as active consumers | Regulator’s decision (Art. 58-1(8)) | Status to be checked | – |
| Peer-to-peer trading procedure | Regulator’s procedure (Art. 58-1(11)) | Not set | – |
| Taxation of communities and internal settlement | Tax Code, tax authority guidance | No specific rules | – |
| Corrections to past periods and member disputes | Metering Code, retail rules | Not described for communities | GEO-03, GEO-09 |
What blocks launch most
- Data. Without a virtual metering point procedure and data access there is no share calculation and no way to check a bill. This is a Metering Code issue, not only chapter 10.3.
- Tariff. Without a basis for a differentiated tariff, households often get no economic case for a community (see economics).
- Roles. Without an administrator role every small community must be its own IT operator, and without clear imbalance roles suppliers and BRPs will not sign contracts.
How and in what order these can be solved: Reforms needed.
Sources
- Law No. 2019-VIII, Arts. 53, 58-1, 58-2 (in Ukrainian) (opens in a new tab) · Verkhovna Rada of Ukraine
- NEURC draft resolution of 4 Nov 2026 (in Ukrainian) (opens in a new tab) · NEURC
A draft, not adopted.
- Commercial Metering Code (No. 311, in Ukrainian) (opens in a new tab) · NEURC
- Distribution System Code (No. 310, in Ukrainian) (opens in a new tab) · NEURC
- Wesfin Flex submission No. 59 (Ukrainian) · Wesfin Flex LLC
- Wesfin Flex submission No. 66 (Ukrainian) · Wesfin Flex LLC
This is an explanatory text by Wesfin, not legal advice. Legal acts are quoted from official texts as of the check date; verify the current version before acting.
Read next
- Regulation
Reforms needed: an agenda for energy communities in Ukraine
What must change, and in what order, for communities to work: adopt the NEURC procedure, open DataHub data, introduce proximity tariffs, define roles. Wesfin proposals with references.
- Regulation
NEURC draft resolution of 4 Nov 2026: the community energy-sharing procedure
What the draft amendments to retail rules No. 312 and procedure No. 2651 propose: chapter 10.3 on communities, a virtual metering point in DataHub, static and dynamic algorithms, imbalances, member exit, a 10 kWh threshold. A draft, not adopted.
- Learn
Commercial launch of a community: seven conditions before sharing becomes billing
What a community needs to move from a model to real settlement: a legal entity, contracts, verified metering points and EICs, official metering, an algorithm, financial settlement and work with suppliers and BRPs.